View Single Post
Old 03-06-2009, 02:07 PM  
JuiceMonkey
Confirmed User
 
Join Date: Oct 2004
Location: Brisbane/Vancouver/SanFran
Posts: 3,581
http://www.carostatus.com/

Friday, March 6, 2:20pm
March 6th, 2009 | Categories: Uncategorized | Tags:
At 12:41 a utility fault caused phase B of the main power feed of DC3 to disconnect which caused our ATS to transfer power to our generator until which time we were on our generator ’til 1:15. Our ATS read a fault and and went into EPO with respect to the initial issue which caused phase B to fail. Local service technicians are working on solving the problem as fast as possible.
__________________
ICQ: 72251955 GTalk: JuiceMonkey
JuiceMonkey is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote