Quote:
Originally Posted by waxman
As someone that is very familiar with most forms of concrete/stone work. That job could have been done for for 65-75k.
As it stands now I really hope the bottom of that fountain has some kind of sealant work done, because I can see expansion joints in the bottom, which later will lead to cracks and crumbling concrete. Also curious about the deck is that poured concrete or cooldeck?
|
there is an extruded plastic membrane that was set in the base. After that cured the walls were centered over that and the membrane is tied into the vertical walls. The basin slopes 8" from the walls to the center. The joints were siliconed after the interior walls were sealed. Again, the people that built this does these for cities and commercial customers all over the Midwest. This was why I selected them.