View Single Post
Old 06-23-2013, 07:03 PM  
Minte
Babemeister
 
Industry Role:
Join Date: Jun 2001
Location: Madison
Posts: 7,081
Quote:
Originally Posted by L-Pink View Post
Well fuck. People are just commenting on something that doesn't sound right. Minte isn't stupid so what's up with 200 grand plus? Now ithe price also includes the removal and replacement of a shit load of concrete sidewalk work and who knows what else.
The price included everything. It was a turnkey project. They planted the trees, shrubs, flowers..even the lawn around the fountain and the lobby area which they poured the new sidewalks. The furniture, the custom stainless planters which are not here yet. They did all the electrical and plumbing. from inside the factory.
And yes,they did a lot of concrete work. Even a portion of the sidewalk around the circle drive was old and beat up. They replaced that also.


I stood around from time to time and watched, took some pictures and wrote out the checks.
__________________
You might not be as anonymous as you think you are.
Minte is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote