GoFuckYourself.com - Adult Webmaster Forum

GoFuckYourself.com - Adult Webmaster Forum (https://gfy.com/index.php)
-   Fucking Around & Business Discussion (https://gfy.com/forumdisplay.php?f=26)
-   -   The fountain is done - pics (https://gfy.com/showthread.php?t=1113179)

AllAboutCams 06-22-2013 07:25 AM

Looks really nice im shocked it cost that much but i guess im not seeing the whole picture.

p.s. its in need of a bottle of bubble bath added

lucas131 06-22-2013 07:25 AM

that is very pimpin! :thumbsup congrats on the success :thumbsup

seeandsee 06-22-2013 07:35 AM

Looks nice, but 200k, damn that is lots of money!

ThunderBalls 06-22-2013 07:36 AM

I don't know who's worse, the dumbass who expects people to believe he paid 200k for a 10k fountain that you fill with a water hose or the kids sucking his cock over it.

Oh, but its so impressive the Governor is going to visit the plant. :1orglaugh

ThunderBalls 06-22-2013 07:58 AM

Quote:

Originally Posted by Minte (Post 19682067)
It never mattered what kind of post I made here at GFY.. There have always been trolls. That's what made GFY what it is. I could make a post giving out $100 each to the first 20 posters, and the first 3 posts would call me a cheap asshole for not making it $1000.

None are so empty as those who are full of themselves.

lucas131 06-22-2013 08:20 AM

Quote:

Originally Posted by ThunderBalls (Post 19682113)
None are so empty as those who are full of themselves.

looks like you have some serious hate in you

Chosen 06-22-2013 09:46 AM

Nice fountain :)

directfiesta 06-22-2013 01:46 PM

http://a1.ec-images.myspacecdn.com/i...ea4e75b6/l.jpg

soon in your neighborhood ...

xNetworx 06-22-2013 02:15 PM

Yeah, sorry Minte, at second glance, that is a shitty fountain for 200k. You really got butt fucked on that one.

Chris 06-22-2013 02:26 PM

lol @ all the hate.


95% of these people wish they had 200k to justify a fountain

Congrats on the success minte :)

24/7 Blogging Crew 06-22-2013 02:53 PM

Quote:

Originally Posted by ThunderBalls (Post 19682096)
I don't know who's worse, the dumbass who expects people to believe he paid 200k for a 10k fountain that you fill with a water hose or the kids sucking his cock over it.

Oh, but its so impressive the Governor is going to visit the plant. :1orglaugh

:1orglaugh:1orglaugh:1orglaugh:1orglaugh:1orglaugh

Dvae 06-22-2013 03:08 PM

Quote:

Originally Posted by tony286 (Post 19682017)
Not true,Ive seen people show shit off they bought and lots of cool, that's nice. Minte hasnt worked in adult in years. It seems like he just comes here to show off and I think that's what turns people off. 95 percent of this board doesn't even know who he is. I personally dont care and he seems like a nice enough guy. Nice fountain,they did a good job.

Typical liberal rant. Shun success much?

24/7 Blogging Crew 06-22-2013 03:32 PM

Quote:

Originally Posted by CamBoss (Post 19682446)
Yeah, sorry Minte, at second glance, that is a shitty fountain for 200k. You really got butt fucked on that one.

:1orglaugh:1orglaugh:1orglaugh

double penetrated butt fuck

Mutt 06-22-2013 04:12 PM

i was surprised Minte's fountain cost 200K - but like the rest of you i know jack shit about custom water fountain construction and costs. my guess would have been 50-75K

here's the world's most expensive outdoor water fountains - Dubai Mall, cost $271 million


24/7 Blogging Crew 06-22-2013 04:23 PM

i cunt a4rd a fountain

Dead 06-22-2013 04:29 PM

Quote:

Originally Posted by Minte (Post 19680755)
As long as it doesn't get messed up we are leaving it open to the public to enjoy.

We are doing the civil thing. I am matching the money that gets tossed into the fountain and donating it to the local food pantry this fall.

Just went back and read this, Very cool! :thumbsup

CT-Content 06-22-2013 05:30 PM

Quote:

Originally Posted by Minte (Post 19681995)
I took the Mrs. to Italy, got her a new SLK and still built the fountain.
What did you do this spring beyond make yourself look like an idiot.

Took the girlfriend to Rita's Water Ice, bought her a new pregnancy test, then banged my bartender. :1orglaugh

Orgasmics 06-22-2013 05:38 PM

Quote:

Originally Posted by Minte (Post 19680755)
We are doing the civil thing. I am matching the money that gets tossed into the fountain and donating it to the local food pantry this fall.

Civil would be donating all or part of the money in the fountain. Matching the money, well, that's a class act. :thumbsup

Hope all is well, Mr. Jablomi.

pimpmaster9000 06-23-2013 04:56 AM

nobody is stupid enough to pay 200K for a 9m fountain consisting of a water pump, some lights and fucking bricks...

L-Pink 06-23-2013 08:32 AM

Quote:

Originally Posted by crucifissio (Post 19683026)
nobody is stupid enough to pay 200K for a 9m fountain consisting of a water pump, some lights and fucking bricks...

Stamped concrete not even bricks.

geedub 06-23-2013 08:48 AM

Bunch of fucking geniuses here on GFY.

dyna mo 06-23-2013 08:51 AM

i propose a new gfy rule, from now on, all gfy fountain threads shall have in the title, the intro:

by request, not bragging..[insert specific fountain topic here]


that has seemed to work well in the past with cars, sneakers, butt plugs, etc., et al

CT-Content 06-23-2013 11:10 AM

Quote:

Originally Posted by Chris (Post 19682451)
lol @ all the hate.


95% of these people wish they had 200k to justify a fountain

Congrats on the success minte :)

Look at this anti-hate fucking hypocrite!

You're the Tourette syndrome asshat who created the Troll Patrol thread with all of Barry's personal info! - Gotta love you two faced sanctimoniousness self-righteous asswipes!

L-Pink 06-23-2013 01:49 PM

Quote:

Originally Posted by Mutt (Post 19682531)
i was surprised Minte's fountain cost 200K - but like the rest of you i know jack shit about custom water fountain construction and costs. my guess would have been 50-75K

I'm part owner in a water feature construction and parts supply company. You are pretty much dead on with your estimate. In fact a bit high.


.

nexcom28 06-23-2013 01:55 PM

Waste of money

SuckOnThis 06-23-2013 02:18 PM

Quote:

Originally Posted by L-Pink (Post 19683466)
I'm part owner in a water feature construction and parts supply company. You are pretty much dead on with your estimate. In fact a bit high.


.

Hater! :1orglaugh

L-Pink 06-23-2013 02:40 PM

Quote:

Originally Posted by SuckOnThis (Post 19683503)
Hater! :1orglaugh

Hey, I bit my tongue thru 3 pages lol lol.

.

SGS 06-23-2013 02:45 PM

Quote:

Originally Posted by L-Pink (Post 19683526)
Hey, I bit my tongue thru 3 pages lol lol.

.

:1orglaugh :1orglaugh

TurboAngel 06-23-2013 03:06 PM

That looks nice.

brassmonkey 06-23-2013 03:14 PM

Quote:

Originally Posted by Minte (Post 19680618)
it's a really nice place to have a meeting with customers. The LED lights look great at night. There is a control unit that allows changes of colors by turning a few dials.

We have six custom stainless steel planters being made that will be finished in a few weeks.

http://www.mintesfiles.com/gfy/fountain_11.jpg

wait a minute why is there a water hose hanging in there? :Oh crap its filled from a water line right? :helpme

waxman 06-23-2013 03:22 PM

Quote:

Originally Posted by L-Pink (Post 19683466)
I'm part owner in a water feature construction and parts supply company. You are pretty much dead on with your estimate. In fact a bit high.


.

As someone that is very familiar with most forms of concrete/stone work. That job could have been done for for 65-75k.
As it stands now I really hope the bottom of that fountain has some kind of sealant work done, because I can see expansion joints in the bottom, which later will lead to cracks and crumbling concrete. Also curious about the deck is that poured concrete or cooldeck?

SGS 06-23-2013 03:22 PM

Quote:

Originally Posted by Minte (Post 19680618)
it's a really nice place to have a meeting with customers. The LED lights look great at night. There is a control unit that allows changes of colors by turning a few dials.

We have six custom stainless steel planters being made that will be finished in a few weeks.

http://www.mintesfiles.com/gfy/fountain_08.jpg

http://www.mintesfiles.com/gfy/fountain_09.jpg

http://www.mintesfiles.com/gfy/fountain_10.jpg

http://www.mintesfiles.com/gfy/fountain_11.jpg

$200k??

It's true what they say. You can't buy taste. :2 cents:

Minte 06-23-2013 03:22 PM

Quote:

Originally Posted by L-Pink (Post 19683466)
I'm part owner in a water feature construction and parts supply company. You are pretty much dead on with your estimate. In fact a bit high.


.

This is not a fish pond in some ones back yard.

You have a licensed designer on staff to do the renderings for the planning commission presentations. He also had to be at two city council meetings. And then you have a landscape designer to do renderings and presentations at the same meetings. And of course you have a licensed engineer to work with the building inspector to get the building permit. Keep in mind there was no power or water at the site. The water wasn't a huge problem. They had to tunnel about 100' to get to a place in the factory where there was water. The pump is 7.5hp 220v Price that out and then add the disconnects at both ends of nearly 400ft between where there was adequate power in the plant. Now add in the cost of the custom stainless manifold.

The area is low, there was groundwater with 2' of the surface. I can take pictures of the mountain of material they had to remove. It's all still sitting behind the plant.

We had 3 separate companies that specialize in all the areas required to complete a commercial project like this quote the project.


You would've lost your ass on this project.. bigtime.

Minte 06-23-2013 03:25 PM

Quote:

Originally Posted by brassmonkey (Post 19683554)
wait a minute why is there a water hose hanging in there? :Oh crap its filled from a water line right? :helpme

That was a sump to pump out rainwater. The basin has autofill.

Dead 06-23-2013 03:34 PM

Quote:

Originally Posted by L-Pink (Post 19683173)
Stamped concrete not even bricks.

Cast formed, not stamped, will outlive brick and mortar. But you would know this as part owner of fountain company.....and does your estimate include landscaping, flag poles, tables, all other expenses??? Turn key cost for this project, with permits...oh yea, and legal labor???
He didn't just buy the water feature, he bought the WHOLE picture...Damn you guys can be assholes at times.....He is one of the good guys, let's try and remember this. And for the record, me and Minte have never had any business, different corners, just enjoyed his posts ever since I signed on to the net.

Minte 06-23-2013 03:34 PM

Quote:

Originally Posted by waxman (Post 19683557)
As someone that is very familiar with most forms of concrete/stone work. That job could have been done for for 65-75k.
As it stands now I really hope the bottom of that fountain has some kind of sealant work done, because I can see expansion joints in the bottom, which later will lead to cracks and crumbling concrete. Also curious about the deck is that poured concrete or cooldeck?

there is an extruded plastic membrane that was set in the base. After that cured the walls were centered over that and the membrane is tied into the vertical walls. The basin slopes 8" from the walls to the center. The joints were siliconed after the interior walls were sealed. Again, the people that built this does these for cities and commercial customers all over the Midwest. This was why I selected them.

scottybuzz 06-23-2013 03:38 PM

wow, i got to get in the fountain industry.
mad $$$

waxman 06-23-2013 03:50 PM

Quote:

Originally Posted by Minte (Post 19683567)
there is an extruded plastic membrane that was set in the base. After that cured the walls were centered over that and the membrane is tied into the vertical walls. The basin slopes 8" from the walls to the center. The joints were siliconed after the interior walls were sealed. Again, the people that built this does these for cities and commercial customers all over the Midwest. This was why I selected them.

Minte,
I am not trying to piss on your parade or downplay your fountain. The fountain looks nice,btw. But as someone that started pushing wheelbarrows and humping concrete and stone with my pops and uncle, when most kids were playing with friends. I honestly do think you overpaid. I just got tired of sore back, raspberrys/concrete burns,busted knuckles, working at the pace of the concrete.
Just my 2c for whats it worth.

Minte 06-23-2013 03:58 PM

Quote:

Originally Posted by waxman (Post 19683580)
Minte,
I am not trying to piss on your parade or downplay your fountain. The fountain looks nice,btw. But as someone that started pushing wheelbarrows and humping concrete and stone with my pops and uncle, when most kids were playing with friends. I honestly do think you overpaid. I just got tired of sore back, raspberrys/concrete burns,busted knuckles, working at the pace of the concrete.
Just my 2c for whats it worth.

I don't disagree it was pricey. However, there is a lot of extra concrete work they did that was included. First, they removed and replaced nearly 4000 sq feet of sidewalk that leads to the main entrance, and they put in a new 12' w x 120' long sidewalk from the lobby to the staff parking lot.

Before they even could start the fountain, they had 2 men for 2 full days with a bobcat and a dumptruck remove 40 year old yews that filled the 72' diameter circle.

brassmonkey 06-23-2013 04:11 PM

Quote:

Originally Posted by Minte (Post 19683561)
That was a sump to pump out rainwater. The basin has autofill.

i now see how it cost that much probably would have been cheaper if it was built with the park. :2 cents: not after :)

beerptrol 06-23-2013 04:20 PM

It cost 75k to build, and 125k to remove Hoffa's body and "Fuhgeddaboudit!"

L-Pink 06-23-2013 06:08 PM

Quote:

Originally Posted by Minte (Post 19683587)
I don't disagree it was pricey. However, there is a lot of extra concrete work they did that was included. First, they removed and replaced nearly 4000 sq feet of sidewalk that leads to the main entrance, and they put in a new 12' w x 120' long sidewalk from the lobby to the staff parking lot.

So the fountain didn't cost over $200,000 like you said it did. How the fuck does anyone else here know how much work was done elsewhere? You said more than $200,000 and that's what people commented on. We did a fountain for a local city park.

Site prep work plus.
32' across
2 1/2' deep
Real brick exterior and cap over concrete base.
CIM liquid rubber interior coating
1- 3" center nozzle
4- 2" cascade nozzles
8- perimeter fan jet nozzles
Automatic in wall water filler
2 stage anemometer (wind sensor)
3- 5hp pumps
200 amp sub-panel with disconnect
8- lights w/ j-boxes
Floor drains with safety grates

Accepted bid was $58,000. Our costs totaled out at just under $33,000.
Profit was $25,000.

I'm on my phone and can't post a photo.

.

.

brassmonkey 06-23-2013 06:34 PM

Quote:

Originally Posted by L-Pink (Post 19683666)
So the fountain didn't cost over $200,000 like you said it did. How the fuck does anyone else here know how much work was done elsewhere? You said more than $200,000 and that's what people commented on. We did a fountain for a local city park.

Site prep work plus.
32' across
2 1/2' deep
Real brick exterior and cap over concrete base.
CIM liquid rubber interior coating
1- 3" center nozzle
4- 2" cascade nozzles
8- perimeter fan jet nozzles
Automatic in wall water filler
2 stage anemometer (wind sensor)
3- 5hp pumps
200 amp sub-panel with disconnect
8- lights w/ j-boxes
Floor drains with safety grates

Accepted bid was $58,000. Our costs totaled out at just under $33,000.
Profit was $25,000.

I'm on my phone and can't post a photo.

.

.

L-pink leaks you better go into hiding :1orglaugh

L-Pink 06-23-2013 06:41 PM

Quote:

Originally Posted by brassmonkey (Post 19683674)
L-pink leaks you better go into hiding :1orglaugh

Well fuck. People are just commenting on something that doesn't sound right. Minte isn't stupid so what's up with 200 grand plus? Now ithe price also includes the removal and replacement of a shit load of concrete sidewalk work and who knows what else.

Minte 06-23-2013 07:03 PM

Quote:

Originally Posted by L-Pink (Post 19683679)
Well fuck. People are just commenting on something that doesn't sound right. Minte isn't stupid so what's up with 200 grand plus? Now ithe price also includes the removal and replacement of a shit load of concrete sidewalk work and who knows what else.

The price included everything. It was a turnkey project. They planted the trees, shrubs, flowers..even the lawn around the fountain and the lobby area which they poured the new sidewalks. The furniture, the custom stainless planters which are not here yet. They did all the electrical and plumbing. from inside the factory.
And yes,they did a lot of concrete work. Even a portion of the sidewalk around the circle drive was old and beat up. They replaced that also.


I stood around from time to time and watched, took some pictures and wrote out the checks.

brassmonkey 06-23-2013 07:09 PM

Quote:

Originally Posted by Minte (Post 19683700)
The price included everything. It was a turnkey project. They planted the trees, shrubs, flowers..even the lawn around the fountain and the lobby area which they poured the new sidewalks. The furniture, the custom stainless planters which are not here yet. They did all the electrical and plumbing. from inside the factory.
And yes,they did a lot of concrete work. Even a portion of the sidewalk around the circle drive was old and beat up. They replaced that also.


I stood around from time to time and watched, took some pictures and wrote out the checks.

oh yeah you own a factory. why do you come down here and post with us? :helpme j/k :)

L-Pink 06-23-2013 07:14 PM

Quote:

Originally Posted by Minte (Post 19683700)
The price included everything. It was a turnkey project. They planted the trees, shrubs, flowers..even the lawn around the fountain and the lobby area which they poured the new sidewalks. The furniture, the custom stainless planters which are not here yet. They did all the electrical and plumbing. from inside the factory.
And yes,they did a lot of concrete work. Even a portion of the sidewalk around the circle drive was old and beat up. They replaced that also.


I stood around from time to time and watched, took some pictures and wrote out the checks.

Well that sounds more like it. Right after you made the post I contacted another GFY'er and asked wtf? The money just didn't add up and generally speaking someone smart enough to earn 200 grand isn't dumb enough to get taken on a simple fountain.

Sounds like you did a nice exterior facelift on your factory grounds and that's great. Wasn't trying to be a dick but something just didn't make sense.

Take care man.

.

RandyRandy 06-23-2013 07:30 PM

Quote:

Originally Posted by L-Pink (Post 19683666)

CIM liquid rubber interior coating

Cum in mouth?

Matt 26z 06-23-2013 07:33 PM

I would upgrade the center with a large industrial inspired artsy object with water running down over it. You could potentially make it yourself.

Asparaguss 06-23-2013 08:39 PM

Wow very nice, how about a pic of it at night?


All times are GMT -7. The time now is 10:17 AM.

Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
©2000-, AI Media Network Inc123